fredag den 19. december 2008
Panels from hell
This toke me 3 nites to get to this point... and they work !!
but im very happy with the outcome... couse this was S.. hard
torsdag den 11. december 2008
Almost like x-mas part duex
Fool'd a bit around with the lifescanner parts... just wanted to see if they actully fitt into the pieholes i cut
A wierd Goblin that lives under my bed.
Almost like X-mas
Skirt from wired droids! nice
Center ankle from JAG
Lower plate from the frame, center ankle and skirt prim'd
Skirt and center ankle painted
An forgotten prop or is it ??...
And whopti dhouu we have the center ankle set up :)
Testing testing
A little peak inside (not much room for a Dwurf)
And now on all 3 ankles + center foot lol
Next step is to reinstal all the piepanel and get em working(no servos) and get the sound system to make some noise!
Center ankle from JAG
Lower plate from the frame, center ankle and skirt prim'd
Skirt and center ankle painted
An forgotten prop or is it ??...
And whopti dhouu we have the center ankle set up :)
Testing testing
A little peak inside (not much room for a Dwurf)
And now on all 3 ankles + center foot lol
Next step is to reinstal all the piepanel and get em working(no servos) and get the sound system to make some noise!
onsdag den 10. december 2008
lørdag den 6. december 2008
The other day a surprice box was drop'd off at my doorstep... i thought it would come here first thing 09 but nope... R2-C4's 3rd last piece is here... SKIRT!! And of couse Salacious tought it was something for him...
luckyly i got a hold of it again before he ... yea u know... he bites and drool over alu too !!
Dosent look like much when its on... but holy S... WE are almost there... 2 pieces more !! and the outer is done done done!!
luckyly i got a hold of it again before he ... yea u know... he bites and drool over alu too !!
Dosent look like much when its on... but holy S... WE are almost there... 2 pieces more !! and the outer is done done done!!
Abonner på:
Opslag (Atom)